Thorne Road, Doncaster
This project is on behalf of Heffernan Utilities and Galliford Try, providing traffic management for a 6-month water mains installation, using multiple setups to support the different phases of the works.
- Client Type
- utility
- Location
- Thorne Road, Doncaster
- Date
- December 2025 - June 2026
- Project Size
- Major Project
- Services
Scope of work
- Full traffic management provision for a 6-month phased water mains installation
- Implementation of road closures as the primary traffic management method
- Installation and management of temporary traffic light systems where required
- Temporary road closures with clearly signed diversion routes
- Safe pedestrian management through and around the works
- Ongoing monitoring, maintenance and adjustment of traffic management layouts
- Coordination with the principal contractor and local highways authority
All layouts complied with Chapter 8 and NHSS 12D standards and were delivered by LANTRA-qualified operatives.
Our approach
This project on Thorne Road, Doncaster involves working within a busy live highway environment over an extended 6-month period, requiring a flexible and well-coordinated approach to traffic management.
From the outset, careful planning has allowed works to be carried out safely while keeping disruption to a minimum. As the project progresses through different phases, traffic management setups are regularly reviewed and adapted to suit changing site conditions.
Our approach has focused on:
- Delivering road closures as the primary method to support safe working areas
- Introducing temporary traffic signals in key sections where closures are not feasible
- Maintaining clear and effective diversion routes for road users
- Ensuring safe and accessible pedestrian routes at all times
- Monitoring sites regularly and adjusting layouts as required
- Working closely with the client and local authority to ensure smooth delivery
By remaining adaptable and proactive, we are able to maintain safety, efficiency, and minimal disruption throughout the duration of the works.
Outcome
The project is progressing safely and efficiently, with traffic management measures supporting each phase of the works.
Primarily using road closures, with temporary signals where needed, has allowed works to proceed with minimal disruption while maintaining safety for both operatives and the public.
By adapting our approach to changing site conditions, we have maintained consistent traffic flow, clear route guidance, and reliable access throughout.
This project demonstrates our ability to deliver flexible, practical traffic management solutions on long-term live highway works.